Laserfiche WebLink
Amendment 10 + <br /> Disturbance Diversion <br /> Boundary Inlet + <br /> Proposed � Globe Hill Pit <br /> Designed ,- v, Perimeter <br /> Diversion Ditch + <br /> " `- + <br /> r-- <br /> Globe Hill Pit <br /> Design <br /> Surveyed + <br /> Poverty Gulch <br /> Drainage <br /> Diversion <br /> Outlet <br /> s r. <br /> �+ <br /> r ' <br /> ' Contour Interval=5 feet r <br /> fi r <br /> Figure 2. Proposed Stormwater Diversion Channel on Northwest Side of Future Globe Hill Pit. <br /> Schedule <br /> Upon approval of this TR, clearing trees and stripping growth medium material will commence <br /> inside the 400 foot buffer of the Poverty Gulch area to coincide with current pit development <br /> activities. The diversion channel will take approximately three weeks to construct and is planned <br /> to commence in late spring to avoid frost concerns. <br /> Financial Warranty <br /> Newmont has determined the development of this stormwater diversion channel will not affect <br /> the financial warranty carried with the state as the diversion channel will stay in place as a <br /> closure feature. <br /> Enclosed please find check no. 200025832 in the amount of $1,006 for the technical revision <br /> fee. Should you require further information please do not hesitate to contact me at <br /> 719.689.4055 or Meg.Burt(a)newmont.com. <br />