Laserfiche WebLink
EXHIBIT L-RECLAMATION COSTS <br /> Item Description Quantity Units Unit Cost Subtask Cost Total Cost <br /> 1.0 Mobilization/Demobilization 1 $805,045 <br /> 1.1 Season 1 LS 7% Base Cost $563,531 <br /> 1.2 Season 2 LS 3% Base Cost $241,513 <br /> 2.0 Project Safety Plan and Implementation 1 LS 2% Base Cost $161,009 <br /> 3.0 Erosion,Sedimentation and Dust Control 1 LS 1% Base Cost $80,504 <br /> 4.0 Debris Removal 25 LOADS $1,500 $37,500 <br /> 5.0 Earthwork $7,553,000 <br /> 5.1 Blasting and Excavation 364,700 CY $15 $5,470,500 <br /> 5.2 Backfill Placement and Compaction 364,700 CY $5 $1,823,500 <br /> 5.3 Talus 18,500 CY $14 $259,000 <br /> 6.0 Scour Berm 5,200 CY $10 $52,000 <br /> 7.0 Soil Conditioning 39 ACRE $190,729 <br /> 7.1 Soil Growth Medium 31,460 CY $5 $157,300 <br /> 7.2 Soil Amendments (300 Ibs/Acre) 11,700 LBS $3 $33,429.24 <br /> 8.0 Sedimentation Pond Reclamation 2,222 CY $10 $22,220 <br /> 9.0 Revegetation 39 ACRE $5,000 $195,000 <br /> Base Cost(Items 4.0-10.0) $8,050,449 <br /> Total Cost $9,097,008 <br /> 1 <br />