My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-29_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2016-11-29_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:13 PM
Creation date
11/30/2016 8:16:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
Revision
Doc Date
11/29/2016
Doc Name
Adequacy Review Response
From
Aggregate Industries
To
DRMS
Type & Sequence
TR2
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Minimum Bench Width 15 feet <br /> • Maximum Overall Slope Height 150 feet <br /> The existing and planned fill slopes in Technical Revision No. 2 are shown in a <br /> final configuration that meets the recommendations of the 2008 summary report. <br /> The 2008 summary report also states that where the rock slopes will remain <br /> exposed, the final reclamation slopes can have the following configuration: <br /> • Fountain Formation laid back to a single overall slope angle of 1.5H:1 V (33 <br /> degrees). <br /> • Rockfall catchment berm on minimum 20-foot-wide bench, constructed at <br /> the toe of the Fountain Formation and on top of the dacite sill at the contact <br /> of the two units. <br /> The Fountain Formation slopes in Technical Revision No. 2 are shown in a final <br /> configuration that meets the recommendations of the 2008 summary report. <br /> Technical Revision No. 2 is revised to include a letter, signed and sealed by a <br /> Colorado registered Professional Engineer, verifying that the grading plan <br /> presented in Technical Revision No. 2 meets the geotechnical specifications of the <br /> 2008 summary report. <br /> We hope that the above responses satisfactorily address the concerns identified in <br /> the Division's Adequacy Reviews No. 1 and No. 2. If there are still any questions <br /> or unresolved issues regarding the Technical Revision, please let us know at your <br /> earliest convenience so that we may request an extension of time as needed for <br /> continued review. <br /> Sincerely, <br /> HDR <br /> 7ell <br /> .j <br /> John Ballegeer <br /> Project Manager <br /> Cc: Connie Davis —Aggregate Industries-WCR, Inc. <br /> 14 <br /> hdrinc.com <br /> 1670 Broadway, Suite 3400, Denver, CO 80202-4824 <br /> (303) 764-1520 <br />
The URL can be used to link to this page
Your browser does not support the video tag.