My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_PERMIT FILE - M2016009 (9)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016009
>
2016-10-21_PERMIT FILE - M2016009 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2017 11:01:04 AM
Creation date
11/29/2016 3:17:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016009
IBM Index Class Name
Permit File
Doc Date
10/21/2016
Doc Name
Adequacy Review Response #3
From
Environmental Alternatives, Inc.
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.4.4 Exhibit D <br />Mining Plan <br />The Pueblo County Aggregate Project proposes mining the mesa tops of the <br />formations known as Badger Hills in eastern Pueblo County. The site is located south <br />of Olson Road and east of 40th Lane. The target reserve is the Cascajo gravel terrace <br />that ranges in thickness from 10 to 15 feet. Gravel will be mined 10 to 15 feet deep <br />to shale or clay loam, the anticipated stratum immediately beneath the material to <br />be mined. Topsoil and overburden is minimal .with prominent gravel outcrops. The <br />primary commodity is gravel with fines as a secondary commodity. <br />The life of Pueblo County Aggregate Project is market driven. The life of the <br />operation is 20 years or five years per phase. Approximately 20 acres will be mined <br />each year. Fremont requests phased bonding of the affected area. The bond for <br />Phase 1 will include the 35 acres for processing and stockpile area, 78 acres of mine <br />area, and 64 acres of internal and external haul roads for a total of approximately <br />177 acres. <br />The mine will have two haul roads both on private property to minimize <br />potential interruptions to the community and agricultural industry in the area. The <br />southwest haul road will access the southwest corner of the mine permit area and <br />extend west to 36th Lane, a Pueblo County commercial vehicle corridor (Amended <br />Pueblo Area 2035 Long Range Transportation Plan, pg 2-13, 2010), crossing private <br />property and CO State Land Board parcels. The north haul road will access the <br />northeast corner of the permit area, crossing the Bessemer irrigation ditch and <br />extend north to CO Hwy 50. The irrigation ditch crossing structure design is included <br />in Exhibit N as an application to Bessemer Irrigating Ditch Company submitted July <br />12, 2016. The proposed improved structure will not restrict current water capacity <br />or function of the ditch. The distance from the bottom of the crossing decking and <br />the surface of the water during irrigating season is approximately five ft. Fremont <br />insures water flow, ditch capacity and ditch function will not be interrupted during <br />installation. <br />The proposed haul road construction is included in this exhibit. Preliminary <br />southwest haul road construction will include salvaging approximately four to six <br />inches of topsoil, whichever is greatest, using a grader. This topsoil will be shaped <br />into a roadside berm, similar to a wind row, on the downgradient side of the road. <br />The berm will be compacted and armored on the upgradient face. Drainage outlets <br />will be incorporated into the berm using gravel and straw filtration BMPs. This will <br />allow the filtered drainage from adjacent undisturbed lands and the haul road to flow <br />onto the arid ground. The north haul road currently exists as a farm road for <br />approximately 7300 feet from Hwy 50 southward. This road will be improved to a <br />standard represented in the typical haul road diagram without removing topsoil. The <br />portion of the north haul road crossing the currently cultivated land commencing <br />north of Olson Road will commence with salvaging approximately 12 inches of <br />topsoil. The topsoil will be stockpiled in a roadside berm and compacted. <br />The mine will develop in four (4) phases each encompassing one Cascajo <br />gravel mesa. Each phase will be bonded prior to commencement of mining. To <br />protect the view shed of the neighbors to the west and north, Fremont is proposing a <br />View Shed Buffer Area between the west and north faces of the mesa and the permit <br />5 <br />Revised October 18, 2016
The URL can be used to link to this page
Your browser does not support the video tag.