Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip Cut Line from Brush Fire <br />Site: Colowyo Coal Mine Permit Action: MR165 Permit/Job#: C1981019 <br />Seismic: <br />Area: <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 11/23/2016 County: Moffat <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D11T - 11U <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: CO 19-001 <br />Horsepower: 850 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Utilization % <br />Ownership Cost/Hour: <br />$222.81 <br />NA <br />Operating Cost/Hour: <br />$218.91 <br />100 <br />Ripper Ownership Cost/Hour: <br />$18.91 <br />NA <br />Ripper Operating Cost/Hour: <br />$10.01 <br />100 <br />Operator Cost/Hour: <br />$38.89 <br />NA <br />Total Unit Cost/Hour: <br />$509.53 <br />Total Fleet Cost/Hour: $509.53 <br />MATERIAL QUANTITIES Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: <br />NA <br />BCY <br />1.40 acres Rip Depth (ft): <br />1.00 <br />Volume: 2,25 <br />Source of estimated quantity: Table 7 <br />Exh. 13B -T-20 <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />3.51 <br />mph <br />Average Ripping Width: <br />9.83 <br />degrees <br />Average Ripping Length: <br />300.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />1.110 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />1.110 <br />Acres/hr <br />Site Altitude: <br />7,500 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.92 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.92 <br />Acres/hr <br />JOB TIME AND COST <br />4 <br />Fleet size: 1 Grader(s) Total job time: 1.52 <br />Unit cost: $553.002 Per acre Total job cost: $774 <br />NA <br />BCY or CCY <br />Hours <br />�m arc n.,,.. r..a:.......:.... c.. w...--„ <br />