Laserfiche WebLink
EQUIPMENT MOBILIZATION/DEMOBILIZATION <br />Task description: Mobilize Equipment for Remaining Reclamation <br />Site: Roadside Portals Pemnit Action: SL9 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task#: 205 State: Colorado Abbreviation: None <br />Date: 10/26/2016 County: Mesa Filename: 205 <br />User: JLE <br />Agency or organization name: DRMS <br />EQUIPMENT TRANSPORT RIG COST <br />Shiftbasis: 1 per day <br />Cost Data Source: CRG Data <br />Truck Tractor Description: GENERIC ON -HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br />Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0-25 Tons 1 26-50 Tons 51+ Tons <br />Operator Cost/Hour: 1 $27.66 1 $27.66 1 $27.66 <br />Total Unit Cost/Hour: 1 $88.67 1 $117.55 1 $125.45 <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Weight/ <br />Ownership <br />HaulRig <br />Fleet <br />HaulTrip <br />Return Trip <br />DOT Permit <br />Description <br />Unit <br />Cost/hr/unit <br />Cost/hr/unit <br />Size <br />Cost/hr/ <br />Cost/hr/fleet <br />Cost/ fleet <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />(TONS) <br />$52.10 <br />52.10 <br />fleet <br />ATLASCOPCO <br />0.00 <br />$69.43 <br />88.67 <br />1 <br />158.10 <br />$88.67 <br />250.00 <br />ROC D7-11,4.0 <br />in. <br />Drill/Broadcast <br />25.00 <br />$30.65 <br />$88.67 <br />1 <br />$119.32 <br />$88.67 <br />$0.00 <br />Seeder with <br />Tractor <br />Power Mulcher <br />6.00 <br />6.72 <br />88.67 <br />1 <br />95.39 <br />$88.67 <br />0.00 <br />(Reinco M90) <br />Cat 623G <br />41.35 <br />89.32 <br />117.55 <br />1 2 <br />413.74 <br />$235.10 <br />500.00 <br />CatD9T-9SU <br />60.01 <br />1 $97.48 <br />1 $125.45 <br />1 I <br />1 $222.93 <br />$125.45 <br />1 $250.00 <br />Subtotals: 1 $1,009.48 1 $626.56 $1,000.00 <br />ROADABLE EQUIPMENT: <br />Machine Description <br />Total Cost/hr/ Fleet Size <br />unit <br />HaulTrip <br />Cost/hr/fleet <br />Return Trip <br />Cost/hr/fleet <br />Fuel Tanker, 6x4, 210 HP <br />71.26 1 <br />$71.26 <br />71.26 <br />Lube Truck, 6x4, 210 HP <br />$86.81 1 <br />$86.81 <br />$86.81 <br />Flatbed Truck, 6x4, 45K GVW <br />77.43 1 <br />77.43 <br />77.43 <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />$52.10 1 <br />$52.10 <br />52.10 <br />Subtotals: 1 $287.60 1 $287.60 <br />C-1981-041, SL -09 Findings Document Page 75 of 79 <br />