My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2016-11-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 10:47:46 AM
Creation date
11/29/2016 10:46:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
11/23/2016
Doc Name
Proposed Decision & Findings (SL9)
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Loading Time: <br />0.90 Minutes <br />Travel Time (min) <br />Maneuver and Spread Time: <br />0.70 Minutes <br />0.74 <br />Job Condition Correction: <br />1 400.00 <br />Site Altitude: 4850 feet <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad: 1.000 <br />NA <br />CAT HB <br />Job Efficiencv: 0.830 <br />NA <br />(CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />HaulRoute: <br />Seg # <br />Haul Distance (Ft) Grade Roll. Res (%) Total Res (% ) Velocity (fpm) <br />Travel Time (min) <br />1 <br />870.00 0.00 5.00 5.00 1292 <br />0.74 <br />Haul Time: 0.74 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade Roll. Res (%) <br />(%) <br />Total Res (%) <br />Velocity (fpm) <br />Travel Time <br />(ndn) <br />1 <br />1 400.00 <br />0.00 5.00 <br />5.00 <br />2359 <br />0.40 <br />Return Time: 0.40 minutes <br />Total Scraper team cycle time: 2.74 minutes <br />Adjustedforjob conditions: 372.59 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjustedsingle scraper team (unit) hourly production: 745.18 LCY/Hour <br />Adjusted multiple scraper team(fleet)hourly production: 745.18 LCY/Hour <br />Unadjusted unit production/hour: 448.91 LCY/Hour <br />Optimal Numberof Scrapers perpush dozer: <br />JOB TIME AND COST <br />Fleet size: l Team(s) <br />Unitcost: $0.622 /LCY <br />Totaljobtime: 1.03 Hours <br />Totaljob cost: $476 <br />C-1981-041, SL -09 Findings Document Page 73 of 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.