Laserfiche WebLink
Push gradient: 1.000 <br />(CAT HB) <br />Altitude: 1.000 <br />(CAT HB) <br />Material W eight: 1.438 <br />(CAT HB) <br />Blade type: 1.000 <br />(PAT) <br />Net correction: 1.0634 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />2,244.31 LCY/hr <br />2244.31 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.112/LCY <br />Total job time <br />Totaljob cost <br />0.11 Hours <br />$27 <br />C-1981-041, SL -09 Findings Document Page 69 of 79 <br />