Laserfiche WebLink
EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within projectarea region: <br />Total one-way travel dis tance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />TotalRoadable Mob/Demob Cost * * <br />* * one roundtrip, no haulrig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />0.63 <br />0.63 <br />0.63 <br />0.63 <br />Totaljob time: <br />Totaljob cost: <br />GRAND JUNCTION <br />25.00 miles <br />40.00 mph <br />$8,787.55 <br />$989.38 <br />12.50 Hours <br />$9,777 <br />C-1981-041, SL -09 Findings Document Page 56 of 79 <br />