Laserfiche WebLink
Subtotals: 1 $324.38 1 $324.38 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within projectarea region: GRAND JUNCTION <br />Total one-way travel distance: 25.00 miles <br />Average Travel Speed: 35.00 mph <br />Total Non-Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />TotalRoadable Mob/Demob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />HaulTime (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non-Roadable I Roadable <br />Equipment <br />Equipmer <br />0.71 0.71 <br />0.71 1 0.71 <br />0.25 1 NA <br />$5,213.84 <br />$463.40 <br />Totaljobtime: 3.86 Hours <br />Totaljob cost: $5,677 <br />G 1981-041, SL -09 Findings Document Page 54 of 79 <br />