My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-23_GENERAL DOCUMENTS - C1981041
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981041
>
2016-11-23_GENERAL DOCUMENTS - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 10:47:46 AM
Creation date
11/29/2016 10:46:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
11/23/2016
Doc Name
Proposed Decision & Findings (SL9)
From
DRMS
To
Snowcap Coal Company, Inc
Permit Index Doc Type
Findings
Email Name
JLE
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GIN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.700 <br />(FND-MF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material W eight: <br />0.902 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: <br />0.3930 <br />Adjustedunit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />414.85 LCY/hr <br />414.85 LCY/hr <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.632/LCY <br />Total job time <br />Totaljob cost <br />4.75 Hours <br />$1,245 <br />C-1981-041, SL -09 Findings Document Page 40 of 79 <br />
The URL can be used to link to this page
Your browser does not support the video tag.