Laserfiche WebLink
nominated for bond release. Table 1. below lists the areas requested for bond release per SL -09. <br />Table 1. SL9 Application, Areas Requested For Bond Release <br />Area <br />Description <br />Acres <br />Phase II <br />Acres <br />Phase II <br />& III <br />Acres <br />Phase <br />III <br />#1 <br />Roadside North Portal <br />Permanent Drainage & Pond <br />13 <br />North Mine Entries (No <br />4.9 <br />#12 <br />#2 <br />CBA 1 Sump <br />0.3 <br />#3 <br />Ponds 6 & 10 <br />2.4 <br />#4 <br />Pond 11 <br />1.2 <br />#5 <br />CBA2 Re -disturbed during <br />Pond 11 Reclamation <br />0.6 <br />#6 <br />Pond 7 <br />0.5 <br />#7 <br />Pond 8 <br />0.5 <br />#8 <br />Pond 9 <br />0.4 <br />#9 <br />G Substation <br />0.6 <br />#10 <br />CRDA #1 Road <br />1.2 <br />#11 <br />CRDA #1 Re -disturbed Area <br />1 <br />TOTAL <br />2.8 <br />10.3 <br />0.5 <br />A detailed description of the reclamation that was performed and dates of reclamation work <br />completed for each of the disturbed surface areas requested for bond release is provided in <br />SCC's bond release application titled Snowcap Coal Company Phase II, & III Bond Release <br />Application (SL -09). This complete document is available for review on the Division website <br />at www.mining.state.co.us under Mining Data and Imaged Document Data tabs. <br />The Division presently holds a corporate surety performance bond in the amount of <br />$805,952.60 of which $58,631.78 is being requested for release. <br />No comments, written objections, or requests for an informal conference regarding the bond <br />release application were received by the Division. <br />The Division conductedthe SL -09 bond release inspection on October 6, 2016. The site inspection <br />G 1981-041, SL -09 Findings Document Page 4 of 79 <br />Termination of Jurisdiction <br />Area <br />Description <br />Acres <br />North Mine Entries (No <br />#12 <br />Surface Disturbance) <br />0.2 <br />A detailed description of the reclamation that was performed and dates of reclamation work <br />completed for each of the disturbed surface areas requested for bond release is provided in <br />SCC's bond release application titled Snowcap Coal Company Phase II, & III Bond Release <br />Application (SL -09). This complete document is available for review on the Division website <br />at www.mining.state.co.us under Mining Data and Imaged Document Data tabs. <br />The Division presently holds a corporate surety performance bond in the amount of <br />$805,952.60 of which $58,631.78 is being requested for release. <br />No comments, written objections, or requests for an informal conference regarding the bond <br />release application were received by the Division. <br />The Division conductedthe SL -09 bond release inspection on October 6, 2016. The site inspection <br />G 1981-041, SL -09 Findings Document Page 4 of 79 <br />