My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-21_PERMIT FILE - P2011024
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011024
>
2016-11-21_PERMIT FILE - P2011024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 8:49:50 AM
Creation date
11/22/2016 3:50:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011024
IBM Index Class Name
PERMIT FILE
Doc Date
11/21/2016
Doc Name
Addendum To Application
From
Climax Molybdenum
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Due to the steep slopes of the proposed disturbed areas, little top soil is expected. Any <br /> appreciable topsoil encountered will be stockpiled at the drill pads and redistributed upon <br /> completion. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> All drill holes will be plugged according to Rule 5.4. It is thought that the drill holes will <br /> penetrate unsaturated, unconsolidated materials and will continue deeper than ten feet into <br /> bedrock and will not encounter an aqua er. I hese holes shall e securely plugged with <br /> cement at the surf-ace. If any aquifers are encountered, the rules as stated On 5.4.2 will be <br /> fnllowpri <br /> See Attachment B - Prospecting Activity and Abandonment Report <br /> 10. Describe how portals,adits,shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> See Attachment B - Prospecting Activity and Abandonment Report <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> Ra-ads I.Afill be graded and fille-d 2-6, Aecessapi to ble nd- With the adjacent terrain and to meet <br /> natural drainage patterns. Follow rough grading, available topsoil will be applied and seed <br /> will be spread. The seed mixture used will be appropriate to the elevation of the road. <br /> Vehicular access to reclaimed roads will be restricted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.