Flag Resources, Inc. Silt Pit <br /> Permit# M-1981-202SG 2016 Annual Report <br /> Notes: <br /> Please refer to the 2016 Annual Report Map for location of the areas of disturbance in the mine. <br /> We continued to remove material from stockpiles and the mined area. No reclamation is required <br /> at this time. The markings and colors noted in the text refer to areas on the amp. <br /> Notes: <br /> (7) We continued to mine in the area east of the Plant Site as shown on the map. We continue to <br /> mine from the floor of the lake area. No new soils were placed on the topsoil piles and the total <br /> stockpiled topsoil remains at approximately 71,400 Y03 (brown) in the three stockpile areas. <br /> Material has been piled along the part of the north shore so final sloping can be complete in 2017 <br /> We are still using the Plant Site and it contains gravel stockpiles,and the office facilities. <br /> (9) The west lake area covers approximately 44.47 acres± (blue)and approximately 40.51 acres of <br /> the east part of the mine will fill with water when mining ends. We continue to fill and clean the <br /> settling ponds developed in 2006 (dark blue). Limited reclamation is needed in the current mining <br /> area since the slopes are shaped as mining progresses only the above water slopes will need <br /> revegetation. Sloping is complete on approximately 9965 linear feet around the mined areas. <br /> Topsoil is stored along the perimeter of the mined area and the river for use in recoiling the <br /> slopes. The asphalt and concrete batch plants have been removed and cleanup is in progress in <br /> those areas. The asphalt plant area on the west side has been partially resoiled (yellow) <br /> (10) No reclamation is required next year in the Plant Site area or in the mining area east of it. The <br /> western parcel may have additional seeding done as needed on the above water slopes next year. <br /> We will continue to monitor the west lake slopes and do remedial work in that area if necessary. <br /> Slope grading will continue on the eastern lake area. <br /> (11) Mining will continue east of the Plant Site. We will continue to mine on the floor of the <br /> partially mined area. We will continue to monitor the west lake slopes and do remedial work in that <br /> area if necessary. <br /> (14) Weed control was done in June 2016 this year in accordance with the Garfield Weed <br /> Management Plan on the perimeter of the mine and spot work was done on the Plant Site areas and <br /> roadways. Escort and 2-4-1) was applied to the Hoary Crest, and Kochia, and Telar and Milestone <br /> was used on the Russian Knapweed. Ranger pro was use on grass areas to control the weeds in <br /> those areas. Weed control will continue in 2017 as needed. <br /> (18) The current bond is $55,400. The Division reviewed the bond in May 2014 and found it to be <br /> adequate. This annual report shows that less area is disturbed at this time than allowed in the <br /> bond estimate. Reclamation, except seeding, is complete on the western 64.14 acres ±of the site. <br /> We feel the bond is adequate to cover all reclamation requirements for this year. <br />