My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-21_REPORT - M1981088
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981088
>
2016-11-21_REPORT - M1981088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 8:55:42 AM
Creation date
11/22/2016 3:48:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981088
IBM Index Class Name
REPORT
Doc Date
11/21/2016
Doc Name
Annual Fee/Report/Map
From
McCoy Pit
To
DRMS
Annual Report Year
2016
Email Name
ACY
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. Total acres in various stages of reclamation,since permitted mining activities began: Page 4 of 5 <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres �/�-- Total acres Topsoil Mulch application <br /> graded:Uq fertilized w/ replacement rate(tons/ac): <br /> )6"O- apvd fertilizer: I depth(in.): Ci <br /> Seed Fertilizer Mulch <br /> application application �) application <br /> method: method: method: <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? &E5 NO N/A <br /> If"YES", indicate the weed species,control area,control type,application rate and treatment ate on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? YES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO ON/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office o(�tate <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? YES NO N/ <br /> 17. Are all hazardous materials stored within approved spill containment structures? YE NO N/A <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? OYE NO N/A <br /> 19. Is your basis for legal right to enter still valid? .—� YES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES NO) N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S.34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary,current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: <br /> On <br /> vQie- <br /> )an-docofter +(e,55PKb5e jg`I-� n iA I Cj1-P-' ,-5C Tac.J <br /> l e) of �jro-4-,"n <br /> (+,---sm,�c4hoi4a )aA-,4 A-o 4rtJocane/-6 `b4jJ- 10A <br /> �~� ham. �C��1c� u���i' ;n t�► � -�a�e. �a n j & j �--��e/r (j' �1 <br /> er P r 15 e C p �n � �.r ��, Io <br /> ►� I }t �n <br /> - -he- I1- g&-4 01, <br />
The URL can be used to link to this page
Your browser does not support the video tag.