Laserfiche WebLink
6 (FORM 2 -Public filing) <br /> 8. Describe the estimated topsoil depth and how topsoil will be salvaged,stockpiled and redistributed for the re-establishment of <br /> vegetation. Specify approximate topsoil redistribution depth: <br /> Due to the steep slopes of the proposed disturbed areas, little top soil is expected. Any <br /> appreciable topsoil encountered will be stockpiled at the drill pads and redistributed upon <br /> completion. <br /> 9. Describe how drill holes will be plugged(refer to Rule 5.4 of the Rules for required abandonment procedures): <br /> All drill holes will be plugged according to Rule 5.4. It is thought that the drill holes will <br /> penetrate unsaturated, unconsolidated materials and will continue deeper than ten feet into <br /> bedrocR and will not encounter an aquifer. I hese holes shall e securely plugged with <br /> cement at the surface.-if any -encountered-, the rules as stated in 5.4.2 will be <br /> fnIInwpd <br /> See Attachment B - Prospecting Activity and Abandonment Report <br /> 10. Describe how portals, adits, shafts,ponds,excavations,or other disturbances will be reclaimed(refer to Rule 3 and Rule 5 for <br /> specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br /> See Attachment B - Prospecting Activity and Abandonment Report <br /> 11. Describe how roads will be reclaimed or returned to their pre-prospecting(or better)condition: <br /> R-02CIS; I.A.1ill be graded and filled 2s; necessary to blend k4ith the adjacent terrain 2nd to Meet <br /> natural drainage patterns. Follow rough grading available topsoil will be applied and seed <br /> will be spread. The seed mixture used will be appropriate to the elevation of the road. <br /> Vehicular access to reclaimed roads will e restricted. <br />