Laserfiche WebLink
4 (FORM 2-Public filing) <br /> 11. Describe proposed surface excavation or other land disturbance,including roads,pits,trenches,waste piles,drill pads and <br /> collar areas of underground workings,ponds,etc... <br /> Based on 2016 exploration data, further exploration is proposed in the new mountain roads <br /> delineated on the enclosed figures. <br /> 12. Proposed Disturbance(approximate)Describe the proposed drilling to be conducted,including anticipated number of holes, <br /> diameter,depth,location,etc... Submit additional pages if necessary: <br /> A. Drill Pads: Quantity 0.00 Average Width (ft)Average Length (ft) <br /> B. Drill Holes:Quantity 0.00 Depth (ft) Diameter (in) <br /> C. Mud Pits: Quantity 0.00 Average Width (ft)Average Length (ft) <br /> Average Depth 0.00 (ft) <br /> Described proposed underground work,including reopening of old workings,advancement of adits or shafts, <br /> trenches,pits,cuts,rock dumps,or other types of disturbance,describe type,quantity and general dimensions: <br /> F. Other Disturbances(please describe): <br /> NA <br /> G. Indicate Chemicals and Fuels used or stored on site. List type,quantity and method to store. <br /> NA <br /> F. New Road(s): Length 3 7 7 (ft)Width 10.00 (ft) <br /> Significantly Upgraded Road(s) Length 0.00 (ft)Width (ft) <br /> Are culverts or other crossings proposed? If so,please describe: <br />