Laserfiche WebLink
11. Estimated acres to be reclaimed in the next report year. <br /> No reclamation activities are planned for the coming year however, it is difficult for <br /> some of the affected area may reclaim itself with new growth. <br /> 12.Total acres in various stages of reclamation, since permitted mining activities began: <br /> Total acres backfilled: <br /> Total acres seeded w/approved mix: <br /> Total acres w/topsoil replaced: <br /> Total acres mulched w/approved mulch: <br /> Total acres graded: <br /> Total acres fertilized w/apvd fertilizer: <br /> Topsoil replacement depth (in.): <br /> Mulch application rate (tons): <br /> Seed application method: <br /> Fertilizer application method: <br /> Mulch application method: <br /> At this time no reclamation has been initiated. Some the affected land has naturally <br /> reclaimed itself with growths of Aspen, Natural grasses and Raspberry bushes. <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? <br /> YES NO N/A If"YES", indicate the weed species, control area, control type, application <br /> rate and treatment date on the report map. <br /> No known weed species have been identified at this mine site. This question is not <br /> applicable to this operation. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? If <br /> "NO", please explain: <br /> No top soil is stock piled in reserve for reclamation activities for this mine site. All <br /> disturbances is currently located on previously disturbed land that had no top soil. <br /> Also, the oxidized waste rock from excavation activities sustains plant growth <br /> remarkably well. <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? YES NO <br /> N/A If"NO" please explain: <br /> This question is not applicable to this mine site. <br />