Laserfiche WebLink
-4- <br /> I2. Primary future(Post-minine)land use(check one): <br /> Cropland(CR) Pastureland(PL) _ General Agriculture(GA) <br /> Rangeland(RL) Forestry(FR) XX Wildlife 11abitat(WL) (open space) <br /> Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br /> Developed WaterResources(WR) Solid Waste Disposal(WD) <br /> 13. Primary present land use(check one,): <br /> Cropland(CR) Pastureland(PL) General Agriculture(GA) <br /> _ Rangeland(RI.) Forestry(FR) _ Wildlife Habitat(WL) <br /> Residential(RS) _ _ Recreation(RC) XX industriallCommercial(IC) <br /> _ Developed Water Resources(WR) <br /> 14. Method of Mining: Briefly explain mining method(e,g,truck/shovel): Strip topsoil and overburden, <br /> remove sand by front-end loader or backhoe. <br /> 15. On Site Processing: Crushing/Screening <br /> 13.1 Briefly explain mining method(e.g.truck/shovel): _ Front-end loader excavation of sand; <br /> sand is transported usually by conveyor for washing and distribution to customers. <br /> List any designated chemicals or acid-producing materials to be used or stored within permit area: None. <br /> 16. Description of Amendment or Conversion: <br /> If you are amending or converting an existing operation,provide a brief narrative describing the proposed change(s). <br /> _Addition of a few new acres but mainly changes in the reclamation plan and mining plan. <br /> Many changes related to alterations in reclamation and coordination with new major <br /> _ to Colorado Springs airport that is to be built adjacent to the pit. <br />