Laserfiche WebLink
MINING PLAN <br /> separation of the site into two parts. Until the ditch can be moved, little can be done to remedy this <br /> situation. Nevertheless, lands around the east and south sides of the South Area should be able to be <br /> fully reclaimed in a few years. <br /> Extraction in the South Area will primarily involve the Little Johnson Reservoir site and the <br /> J Property. However, there is also a small amount of additional extraction to be done in the former '!• <br /> Phase 6e area which separates the pit from Academy Boulevard south of the tunnel under Academy. <br /> Extraction in the North Area will include the remaining large reserves in the former Phases 5e and <br /> 1 e-north. Both of these are now combined into the North Area. The northern portions of the North ,a <br /> Area is where the critical relocation of the Fountain Mutual Ditch will be implemented as well as <br /> creating the transition from the pit to the highway corridor. Once the ditch is relocated it will be <br /> possible to start merging the North Area with the South Area by removal of the corridor that <br /> --�N <br /> currently contains the Fountain Mutual Ditch. <br /> SOUTH AREA MINING <br /> As stated above, most of the extraction in the South Area has already been completed. The <br /> majority of future extraction here will involve the mining of the Little Johnson Reservoir site. As <br /> described in that permit amendment, this mining must be performed very carefully so as to avoid <br /> exposing the ground water. <br /> LITTLE JOHNSON RESERVOIR MINING PLAN: On the following pages the mining plan for <br /> this area is presented in its entirety. Edited text of the original approved plan are shown using <br /> strikeout text with replacement text in capitals. This plan must be followed very carefully as the <br /> mining of this area ustnep �ground�water interfere with the effectiveness of the <br /> emediation progra hat is being conducted in this area. This plan was previously approved by <br /> amendment in 2005. The Little Johnson mining plan is a separate plan within the overall mining plan <br /> and includes special requirements that specifically address the needs of this area. <br /> LITTLE JOHNSON AMENDMENT <br /> Mining Plan (as stated in that amendment) <br /> INTRODUCTIONAND OVERVIEW: The following mining plan primarily addresses the Little <br /> Johnson amendment area and how it integrates with the THE REST OF THE <br /> Daniels Sand Pit Amendment (2008) Exhibit D Page 9 of 28 <br />