Laserfiche WebLink
Stockpile locations can be found on Map King II -007. Epp 8v Associates <br />surveyors performed topsoil stockpile volume calculations in March, <br />2015 using pre -disturbance and as -built aerial surveys. Topsoil <br />Stockpile # 1 (south) contains 3,479 cubic yards and Topsoil Stockpile #2 <br />(north) contains 27,191 cubic yards for a total of 30,670 cubic yards on <br />site. The current disturbed area is 22.89 acres. To cover 22.89 acres <br />with 6" of topsoil would require 18,465 cubic yards. <br />TOPSOIL, EXPLORATION CORE DRILLING <br />Topsoil will be salvaged and replaced at all areas of new disturbance <br />caused by exploration core drilling that may damage existing topsoil, <br />such as "cuttings pits", used to collect drill cuttings. Existing topsoil will <br />be removed from these areas and stockpiled in a nearby area where it <br />can be accessed without causing damage to the stockpile location. The <br />topsoil stockpile will be "bermed", tarped, or otherwise protected to help <br />prevent loss of topsoil due to rain and wind events. Once the cuttings <br />pits have been re -filled with sub -soil material, the topsoil will be returned <br />to its original location, spread evenly, and re -seeded as detailed in <br />Section 2.05.4 of this document. <br />Topsoil for exploration core drilling and/or monitoring well drilling and <br />reclamation will be salvaged from the following soil map units; Big Blue <br />Clay Loam, Pulpit Loam, Umbarg Loam, and Witt Loam. Topsoil for mine <br />reclamation will be salvaged from the following soil map units where <br />suitable material for reclamation (greater than 6" is recoverable through <br />normal means) is present; Zau Stony Loam. Topsoil for reclamation will <br />not be salvaged for reclamation from the following soil map units; <br />Archuleta -Sanchez Stony Complex, Lazear Stony Loam, and Lazear Rock <br />Outcrop Complex due to limitations for use in reclamation an overall lack <br />of suitable material. <br />A further discussion of topsoil salvage, protection, stabilization at <br />exploration drill pads is contained in Sections 2.04.6 and 2.04.9. <br />OVERBURDEN <br />Approximately 20,500 cubic yards of material was removed from the <br />portal area and used to construct the mine bench and base for all mine <br />surface facilities. Additional overburden may be excavated in the <br />construction of the sediment pond. No overburden will be stockpiled as <br />occurs in surface coal mining operations. There will be no overburden <br />disposal sites at the King II mine. <br />Surface blasting is addressed in Section 2.05.3(6) of this application. <br />GCC Energy, LLC <br />Section 2.05.3 <br />Page 6a <br />King II Mine <br />October 18, 2016 (TR -26 AR#2) <br />