My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-20_PERMIT FILE - C1981035A (10)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-10-20_PERMIT FILE - C1981035A (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2017 7:44:16 AM
Creation date
11/16/2016 1:49:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
10/20/2016
Doc Name
OPERATION PLAN - MINE PLAN AREA METHOD OF COAL EXTRACTION
Section_Exhibit Name
KII 2.05.3 Operation Plan - Mine Plan Area
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 - OPERATION PLAN - MINE PLAN AREA <br />PRODUCTION METHODS AND EQUIPMENT <br />METHOD OF COAL EXTRACTION <br />The King II Mine will be an underground coal mine. A maximum <br />stripping ratio of 1:50 make coal extraction operations amenable to <br />underground methods only. The method used is common to most U.S. <br />underground coal mines and is called coal extraction by room and pillar <br />mining. A series of mine openings are developed from the surface to the <br />coal resources of the mine property. At the King II Mine, the upper <br />Menefee coal seam outcrops along Cochran Canyon. The portals (mine <br />openings) are to be constructed at the seam outcrop. The openings or <br />entries are then advanced in the coal following the seam. No shafts <br />(vertical openings) or inclines through overburden material are <br />necessary. <br />The coal reserves are divided up into sections or panels convenient for <br />extraction. First, rooms are developed leaving coal pillars to support the <br />main roof. Later, after a panel has been developed, the pillars are <br />extracted on retreat from the panel. In this way, the recovery of the coal <br />is maximized. Since pillaring operations began at the King I Mine during <br />the late summer months of 1979, the extraction ratio of coal removed <br />from the panels to coal left behind is 5:1. This is an excellent extraction <br />ratio. <br />MINE WORKINGS <br />Map King II -005 shows proposed mine workings within the Permit Area <br />boundaries. Superimposed above the workings, the surface topography <br />has been drawn in for correlation purposes between the surface and the <br />underground workings. <br />MINING EQUIPMENT <br />The coal will be mined using one or two continuous mining units <br />(sections). These sections consist of one or two continuous miners, 2 -4 <br />shuttle cars, one or two dual boom roof drills (bolter machines), a <br />feeder /breaker belt feeder, and a 12,470- 950/480 volt power center. <br />After coal is ripped from the face, it is loaded into the shuttle cars for <br />transporting to the conveyor belt for removal from the mine. All the <br />above equipment is electrical. Haulage vehicles for moving men and <br />supplies into the mine are diesel or battery powered. <br />Electric power for the mine is supplied by a surface sub - station. Voltage <br />entering the mine is 12,470VAC which is stepped down by the <br />GCC Energy, LLC King II Mine <br />Section 2.05.3 <br />Page 1 November, 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.