My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-02_REVISION - C1981018
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981018
>
2016-11-02_REVISION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2016 12:34:01 PM
Creation date
11/16/2016 11:26:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
11/2/2016
Doc Name
Cost Estimate
From
DRMS
To
Scott Wanstedt
Type & Sequence
TR70
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Reclamation of the B Seam Dewatering System #2 <br />Site: Deserado Mine Permit Action: TR 70 Permit/Job#: C1981018 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 11/2/2016 County: Moffat Filename: C018-000 <br />User: CCW <br />Agency or organization name : DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Backfill and Grade B Seam Dewatering System <br />Upper Pond <br />DOZER 1 0.30 $75.00 <br />002 Backfill and Grade B Seam Dewatering System 1st <br />Large Pond <br />DOZER 1 27.34 $6,882.00 <br />003 Backfill and Grade B Seam Dewatering System <br />2nd Large Pond <br />DOZER 1 49.43 $12,441.00 <br />004 Backfill and Grade B Seam Dewatering System <br />Lower Pond <br />DOZER 1 0.52 $132.00 <br />005 Topsoil Replacement of the Upper Pond B Seam <br />#2 System <br />DOZER 1 0.35 $88.00 <br />006 Topsoil Replacement of the 1st Large Pond B <br />Seam #2 System <br />DOZER 1 17.71 $4,457.00 <br />007 Topsoil Replacement of the 2nd Large Pond B <br />Seam #2 System <br />DOZER 1 26.82 $6,752.00 <br />008 Topsoil Replacement of the Lower Pond B Seam <br />#2 System <br />DOZER 1 1.69 $426.00 <br />009 Removal of fence around the B Seam Dewatering <br />System #2 <br />DEMOLISH 1 0.00 $4,545.80 <br />010 Reseed the B Seam Dewatering System #2 Ponds REVEGE 1 4.43 $5,662.00 <br />011 Backfill and Grade B Seam Dewatering System <br />Light Use Road <br />DOZER 1 0.33 $84.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />128.92 <br /> <br />$41,545 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 0.00 Total = $0.00 <br />Performance bond: 0.00 Total = $0.00 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $4,154.50 <br /> TOTAL O & P = $4,154.50 <br /> CONTRACT AMOUNT (direct + O & P) = $45,699.50 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.00 Total = $1,827.98 <br />Reclamation management and/or administration: 3.13 $1,430.39 <br /> <br />CONTINGENCY: 0.00 Total = $0.00
The URL can be used to link to this page
Your browser does not support the video tag.