My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-15_ENFORCEMENT - C1992081
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1992081
>
2016-11-15_ENFORCEMENT - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 10:40:53 AM
Creation date
11/16/2016 9:56:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
Enforcement
Doc Date
11/15/2016
Doc Name
Hayden Gulch Interim Stabilization Measures
From
DRMS
To
Seneca Coal Company, LLC
Violation No.
CV2016002
Email Name
JHB
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Natural ReSQUrCeS <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Jerry Nettleton <br />Seneca II West Mine <br />Seneca Coal Company LLC <br />P.O. Box 670 <br />Hayden, CO 81639 <br />November 15, 2016, 2016 <br />Re: Proposed Hayden Gulch Interim Stabilization Measures <br />Dear Mr. Nettleton: <br />In response to your letter, dated November 8, 2016, regarding mitigation measures Hayden <br />Gulch Terminal, LLC proposes to conduct on the two areas of disturbance that were subject of <br />NOV-CV-2016-002. <br />HGT, LLC commits to removing and disposing of remaining materials and debris at the Peabody <br />owned property in Township 6N, Range 88W, Section 10. Tilling and reseeding of this area will <br />occur in the spring of 2017. The Division is in concurrence with this commitment. <br />Within the State Trust Lands in Township 6N, Range 88W, Section 14, HGT, LLC commits to <br />cleaning up any remaining material and debris, scarifying, if necessary, seeding with the <br />approved dry -land pasture seed mix, and repair fences that were damaged during rail line <br />reclamation activities. HGT, LLC stated that this work would be conducted within 30 days of <br />the November 8, 2016 letter. The Division concurs with the proposed repairs, and anticipates <br />that the repairs will be completed by December 8, 2016. <br />The Division accepts HGT, LLC's proposed mitigation measures for the two disturbed areas, and <br />agrees to the proposed completion schedule. <br />Sincerely, <br />Janet Binns <br />Environmental Protection Specialist III <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor I Robert W. Randall, Executive Director I Virginia Brannon, Director <br />
The URL can be used to link to this page
Your browser does not support the video tag.