My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-15_ENFORCEMENT - P2011015
DRMS
>
Day Forward
>
Enforcement
>
Prospect
>
P2011015
>
2016-11-15_ENFORCEMENT - P2011015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2020 12:57:28 AM
Creation date
11/16/2016 9:15:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011015
IBM Index Class Name
ENFORCEMENT
Doc Date
11/15/2016
Doc Name
30 Day Grace Letter
From
DRMS
To
Colorado Goldfields, Inc.
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 0 4 <br /> MP Annual Report <br /> Permittee Name: Colorado Goldfields Inc. Permit Number: P-2011-015 <br /> Operation Name: Kittimac Tailings Repository County: San Juan <br /> Annual Fee Due: $86.00 Anniversary Date: June 20, 2015 <br /> Permit Acreage: 0.00 Current Bond Amt: $298.00 <br /> According to Colorado Statute, each year, on the anniversary date of the pennit, an operator shall submit the Annual Fee, <br /> an Annual Report and Map showing the extent of current disturbances to affected land,required monitoring information, <br /> reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br /> the upcoming year, any reclamation that will be performed during the upcoming year,the dates for the beginning of activ <br /> operations, and the date active operations ceased for the year. <br /> Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br /> compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br /> rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br /> 1. Is the affected area boundary clearly marked if you have an excavation or portal? YES NO <br /> 2. Is the site in final reclamation? YES NO <br /> If"YES,"please note time limits related to completion of reclamation, Rule 3.1.3. <br /> 3. What was the date of last exploration activity? <br /> 4. What date did prospecting activity end, or what date is it expected to end?Rule 5.6.1(e). <br /> 5. Number of acres currently affected(exploration+incomplete reclamation). <br /> 6. Number of acres that were newly affected during the current report year. <br /> 7. Number of acres that were reclaimed during the current report year. <br /> 8. Estimated new acreage to be affected in the next report year. <br /> 9. Estimated acres to be reclaimed in the next report year. <br /> 10. Total acres in various stages of reclamation, since ennitted exploration activities began: <br /> Total acres Total acres Total acres Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> approved mix: replaced: approved mulch: <br /> Total acres Total acres Topsoil Mulch application <br /> graded: fertilized w/ replacement rate(tons/ac): <br /> apvd fertilizer: depth(in.): <br /> Seed Fertilizer Mulch <br /> application application application <br /> method: method: method: <br /> 11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br /> 12. Is adequate topsoil reserved for reclamation,based on your approved NOI? YES NO N/A <br /> If"NO",please explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.