My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-15_INSPECTION - C2009087
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C2009087
>
2016-11-15_INSPECTION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 8:57:17 AM
Creation date
11/16/2016 7:11:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Inspection
Doc Date
11/15/2016
Doc Name
Inspection Report
From
Peabody Sage Creek Mining, LLC
To
DRMS
Inspection Date
11/9/2016
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 9, 2016 C-2009-087/Peabody Sage Creek Mine JLE <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 7 <br /> <br /> <br />Figure 1. Partial cleanout of FA -D5 Ditch <br /> <br />Pond 004 was holding water and discharging. The embankment was stable and the primary and emergency <br />spillways were clear and functional. <br /> <br />The upper sump and PECOCO pond were holding water and discharging. The embankments were stable and <br />vegetated. The primary and emergency spillways were clear and functional. <br /> <br />The lower sump was holding w ater and discharging, the embankment was stable and vegetated. The primary and <br />emergency spillway was clear and functional. <br /> <br />Pond 002 was discharging. <br /> <br />Pond 003 was holding water and discharging. The embankment was stable and vegetated. The primary and <br />emergency spillway was clear and functional. <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br />The mine is currently idle and no activity is occurring at the site except for site maintenance ac tivities. <br /> <br />OTHER (SPECIFY): <br />The following maintenance items were observed during previous Division inspections. Below is a list of the items <br />along with a description of the current status of the maintenance items. <br /> Several small slumps/depressions have formed above the SII -PM6 Drainage south and east of stock tank <br />T32. It appears that the backfilled area has settled and created these features. The slumps are not very
The URL can be used to link to this page
Your browser does not support the video tag.