My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-15_REVISION - C1982056 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2016-11-15_REVISION - C1982056 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2016 8:58:11 AM
Creation date
11/15/2016 1:37:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
11/15/2016
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
TR86
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: SWMD Thickener Underflow Borehole and Pipeline TR86 <br />Site: Foidel Creek Mine Permit Action: TR86 Permit/Job#: C1982056 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 11/15/2016 County: Routt Filename: C056-000 <br />User: JLE <br />Agency or organization name : DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Plug and Seal SWMD Thickener Underflow <br />Borehole <br />BOREHOLE 1 8.80 $5,091.68 <br />002 Cut-off/Cap SWMD Thickener Underflow <br />Borehole and 6 Manholes <br />BOREHOLE 1 0.00 $423.20 <br />003 Break Up 18" Cemented Surface Casing, SWMD <br />Thickener BH. <br />DEMOLISH 1 1.00 $9.40 <br />004 Backfill and Grade SWMD Thickener Underflow <br />Borehole Pad <br />DOZER 1 4.75 $1,593.00 <br />005 Backfill SWMD Thickener Underflow Pipeline - <br />75 Ft of Trench <br />EXCAVATE 1 1.25 $84.00 <br />006 Topsoil SWMD Thickener Underflow Borehole <br />Pad <br />DOZER 1 0.56 $189.00 <br />007 Revegetation of SWMD Thickener Underflow <br />Pipeline <br />REVEGE 1 1.60 $967.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />17.96 <br /> <br />$8,357 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $168.81 <br />Performance bond: 1.05 Total = $87.75 <br />Job superintendent: 0.00 Total = $0.00 <br />Profit: 10.00 Total = $835.70 <br /> TOTAL O & P = $1,092.26 <br /> CONTRACT AMOUNT (direct + O & P) = $9,449.26 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 4.00 Total = $377.97 <br />Reclamation management and/or administration: 3.13 $295.76 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $1,765.99 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $10,122.99 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.