Laserfiche WebLink
Borehole Worksheet Cont’d Task # TTT Page 10 of 12 <br /> <br />CIRCES Cost Estimating Software <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.700 (FND-MF) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 1.438 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.5639 <br /> <br />Adjusted unit production: 533.45 LCY/hr <br />Adjusted fleet production: 533.45 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.629/LCY <br /> <br />Total job time: 0.56 Hours <br />Total job cost: $189 <br /> <br />