Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> October 2016 Monthly Report <br /> Page 2 <br /> Table 1-October 2016 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 10/31/16 0 <br /> M-6 10/31/16 Dry <br /> M-7 10/31/16 Dry <br /> M-8 10/31/16 Dry <br /> M-9 10/31/16 141.81 <br /> M-10 10/31/16 25.69 <br /> M-1 l R 10/31/16 41.20 <br /> M-12 10/31/16 175.42 <br /> M-13R 10/31/16 126.37 <br /> M-14 10/31/16 131.41 <br /> M-15 10/31/16 89.73 <br /> M-16 10/31/16 22.70 <br /> M-19 10/31/16 23.93 <br /> M-21 10/31/16 18.68 <br /> M-22 10/31/16 17.36 <br /> M-26 10/31/16 16.51 <br /> M-32 10/31/16 45.30 <br /> M-33 10/31/16 56.20 <br /> M-34 10/31/16 23.91 <br /> BF-4 10/31/16 24.87 <br /> BF-6 10/31/16 30.88 <br /> LS-1R 10/31/16 Dry <br /> LS-2R 10/31/16 Dry <br /> LS-3 10/31/16 Dry <br /> LD-1R 10/31/16 Dry <br /> LD-2R 10/31/16 Dry <br /> LD-3 10/31/16 Dry <br /> Table 2—October 2016 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 10/31/16 Dry 72.46 0.00 <br /> P7 10/31/16 92.28 92.50 0.22 <br /> P8 10/31/16 96.77 97.51 0.74 <br /> P9 10/31/16 71.93 72.30 0.37 <br />