Laserfiche WebLink
OpCO� <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> *, 1876 * 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br /> File No.: M- 2000-158 Site Name:S&H Mine <br /> County Weld TR#_ *TR06 �RECE- "Use only) <br /> Permittee: Scout Investments, L.L.C. ►jCOMPLIED! <br /> ✓No Violations <br /> Operator(If Other than Permittee): WU TION <br /> Permittee Representative: <br /> Jason Von Lembke MINING&SAFETY <br /> Please provide a brief description of the proposed revision: <br /> This revision covers a portion of the south of the permit area. The southern portion of the site was recently sold and <br /> no further mining by Scout is planned south of Parcel 105935200007. Scout proposes revising the reclamation plan <br /> to include backfilling the existing, partially open Cell B(Aurora Pit)to pre-mining grade and reclaiming the site as <br /> rangeland. All equipment shall be removed from the site and disturbed areas shall be revegetated. <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review" until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Tyne Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 E <br /> 112 hard rock(not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />