Laserfiche WebLink
King Mines C 198103 5 Midterm Review No. 7 Page 53 of 123 <br />Total one-way travel distance: <br />Average Travel Speed: <br />Total Non-Roadable Mob/Demob Cost * <br />'* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />* * one round trip, no haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />20.00 miles <br />40.00 mph <br />$9,817.50 <br />$233.03 <br />Total job time: 8.00 Hours <br />Total job cost: $10,051 <br />Non-Roadable <br />Roadable <br />Equipment <br />Equipment <br />Haul Time (Hours): <br />0.50 <br />0.50 <br />Return Time (Hours): <br />0.50 <br />0.50 <br />Loading Time (Hours): <br />2.00 <br />NA <br />Unloading Time (Hours): <br />1.00 <br />NA <br />Subtotals: <br />4.00 <br />1.00 <br />JOB TIME AND COST <br />20.00 miles <br />40.00 mph <br />$9,817.50 <br />$233.03 <br />Total job time: 8.00 Hours <br />Total job cost: $10,051 <br />