Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 89 of 123 <br />Task description: <br />BULLDOZER WORK <br />King II - grade portal cuts, access roads, water tank pad <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 307 State <br />Date: 2/11/2015 County <br />User: SLB <br />Colorado <br />La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$69.05 NA <br />$108.22 100 <br />$0.00 0 <br />$38.01 NA <br />$215.28 <br />$215.28 <br />MATERIAL QUANTITIES <br />Initial Volume: 54,789 <br />Swell factor: 1.000 <br />Loose volume: 54,789 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />Page 2.05.3-3, 16.98 ac x 2' depth <br />Cat Handbook <br />50 feet <br />1,400.0 LCY/hr <br />Consolidated stockpile 1.0 <br />7,500 feet <br />900 lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Abbreviation: None <br />Filename: C035-307 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.000 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />