My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (37)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 9:34:01 AM
Creation date
11/10/2016 7:49:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Borehole Worksheet Cont'd Task # TTT <br />BULLDOZER WORK <br />Task description: King II - grade portal cuts, access roads, water tank pad <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 304 <br />Date: 2/11/2015 <br />User: SLB <br />State: Colorado <br />County: La Plata <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />MATERIAL OUANTITIES <br />Initial Volume: 16,562 <br />Swell factor: 1.165 <br />Loose volume: 19,295 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />Map King II -007C <br />Cat Handbook <br />50 feet <br />1,400.0 LCY/hr <br />Consolidated stockpile 1.0 <br />7,500 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Abbreviation: <br />Filename: <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $215.28 <br />Total Fleet Cost/Hour: $215.28 <br />MATERIAL OUANTITIES <br />Initial Volume: 16,562 <br />Swell factor: 1.165 <br />Loose volume: 19,295 LCY <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />5% <br />Map King II -007C <br />Cat Handbook <br />50 feet <br />1,400.0 LCY/hr <br />Consolidated stockpile 1.0 <br />7,500 feet <br />lbs/LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Abbreviation: <br />Filename: <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 AVG.) <br />Material consistency: <br />1.000 (CAT HB) <br />Dozing method: <br />1.000 (GEN.) <br />Visibility: <br />1.000 (AVG.) <br />Page 84 of 123 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.