Laserfiche WebLink
Borehole Worksheet Cont'd <br />minutes <br />Source <br />Task # TTT <br />Truck Bed (volume) Basis: <br />Truck <br />Loader Source <br />Struck Volume: <br />10.00 <br />LCY <br />Heaped Volume: <br />12.00 <br />LCY <br />Average Volume: <br />11.00 <br />LCY <br />Adjusted Volume: <br />12.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes <br />Loading Tool Capacity <br />Rated Capacity: 3.900 LCY (heaped) <br />Bucket Fill Factor: 0.975 Loose material - mixed moist <br />Adjusted Capacity: 3.803 LCY <br />Page 79 of 123 <br />11.41 LCY <br />Bucket Size Class: NA <br />100%) 0.975 <br />Job Condition Corrections: <br />minutes <br />Source <br />Site Altitude (ft.): 7500 feet <br />Material 1/8" to 3/4" diameter -0.02 <br />Truck <br />Loader Source <br />Stockpile: <br />Altitude Ad': <br />1.000 <br />1.000 CAT HB) <br />Truck Ownership: <br />Job Efficiency: <br />0.830 <br />0.830 (CAT HB) <br />Operation: <br />Net Correction: <br />Loading Tool Cycle Time: <br />0.830 <br />0.830 <br />Number of Loading Tool Passes Required to Fill Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />3 <br />passes <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): 0.483 <br />Cycle Time Factors Factor (min.) <br />minutes <br />Source <br />Material: <br />Material 1/8" to 3/4" diameter -0.02 <br />-0.020 <br />(Cat HB) <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high or less 0.01 <br />0.010 <br />Cat HB) <br />Truck Ownership: <br />Common ownership of trucks and loaders -0.04 <br />-0.040 <br />Cat HB <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />-0.090 <br />0.393 <br />0.885 <br />minutes <br />minutes <br />minutes <br />Truck Cvcle Time: <br />Truck Exchange Time: <br />Truck Load Time: <br />Truck Maneuver and Dump Time: <br />Truck Travel (Haul & Return) Time: <br />Haul Route: <br />Seg # Haul Distance (Ft) <br />1 1120.00 <br />0.50 Minutes Adjusted for site altitude: 0.500 Minut <br />0.885 Minutes Adjusted for site altitude: 0.885 Minut <br />0.90 Minutes Adjusted for site altitude: 0.900 Minut <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire penetration 5.0 <br />CIRCES Cost Estimating Software <br />