Laserfiche WebLink
Borehole Worksheet Cont'd Task # TTT Page 75 of 123 <br />(%) I (fpm) (min) <br />1 10560.00 -11.50 5.00 1 -6.50 2938 3.705 <br />Return Time: 3.705 minutes <br />Total Truck Cycle Time: 21.727 minutes <br />Loading Tool unit <br />Production 504.90 <br />Truck Unit Production <br />42.00 <br />Optimal No. of Trucks: 12 <br />LCY/Hour Adjusted for job efficiency: <br />LCY/Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 34.86 <br />Adjusted single truck/loader team production: 34.86 <br />Adjusted multiple truck/loader team production: 34.86 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $8.668 /LCY <br />419.06 LCY/Hour <br />34.86 LCY/Hour <br />1 Truck(s) <br />LCY/Hour <br />_ LCY/Hour <br />LCY/Hour <br />Total job time: 1.06 Hours <br />Total job cost: $321 <br />CIRCES Cost Estimating Software <br />