My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (37)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 9:34:01 AM
Creation date
11/10/2016 7:49:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C 1981035 Midterm Review No. 7 <br />Page 64 of 123 <br />Seg # <br />Haul Distance (Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />I (%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />10560.00 <br />-11.50 5.00 <br />1 -6.50 <br />2938 <br />3.705 <br />Return Time: 3.705 <br />Total Truck Cycle Time: 21.727 <br />Loading Tool unit <br />Production 504.90 LCY/Hour Adjusted for job efficiency: <br />Truck Unit Production <br />42.00 LCY/Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 12 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 209.18 <br />Adjusted single truck/loader team production: 209.18 <br />Adjusted multiple truck/loader team production: 209.18 <br />JOB TIME AND COST <br />minutes <br />minutes <br />419.06 LCY/Hou <br />34.86 LCY/Hou <br />6 Truck(s) <br />LCY/Hour <br />LCY/Hour <br />LCY/Hour <br />Fleet size: 1 Team(s) Total job time: 30.85 Hours <br />Unit cost: $4.038 /LCY Total job cost: $26,060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.