My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-29_PERMIT FILE - C1981035A (37)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2016-08-29_PERMIT FILE - C1981035A (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2019 9:34:01 AM
Creation date
11/10/2016 7:49:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
PERMIT FILE
Doc Date
8/29/2016
Doc Name
Reclamation Bond Information/Estimates
Section_Exhibit Name
KI Appendix 12
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Mines C1981035 Midterm Review No. 7 Page 62 of 123 <br />TRUCK/LOADER TEAM WORK <br />Task description: King II - haul sediment from ponds to King I site <br />Site: King Coal Mine Permit Action: Midterm Review No. 7 Permit/Job#: C1981035 <br />PROJECT IDENTIFICATION <br />Task #: 065 State: Colorado Abbreviation: None <br />Date: 2/11/2015 County: La Plata Filename: C035-065 <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST Shift basis: 1 per day <br />E ui ment Description <br />Truck Loader Team -Truck: Generic 12-18 c , 6x4 <br />-Loader: CAT 938H <br />Support Equipment -Load Area: NA <br />-Dump Area: CAT 938H <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br />Truck Loader Load Area Dump Area Motor Grader Water Truck <br />%Utilization -machine: 100 100 NA 100 NA NA <br />Ownership cost/hour: $15.21 $21.63 NA $21.63 NA NA <br />Operating cost/hour: $66.59 $38.09 NA $38.09 NA NA <br />Ripper op. cost/hour: NA $0.00 NA $0.00 NA NA <br />Operator cost/hour: $26.72 $37.13 NA $37.13 NA NA <br />Unit Subtotals: $108.51 $96.85 NA $96.85 NA NA <br />Number of Units: 6 1 0 1 0 0 <br />Group Subtotals: Work: $747.91 Support: $96.85 Maint: $0.00 <br />Total work team cost/hour: $844.76 <br />MATERIAL QUANTITIES <br />Initial volume: 6,453 CCY Swell factor: 1.000 <br />Loose volume: 6,453 LCY <br />Source of estimated volume: 2 pond cleanings, 2 ac ft each cleanout <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,700 Pounds/LCY <br />Description: Earth - Wet excavated <br />Rated Payload: 50,300 Pounds <br />Payload Capacity: 18.63 LCY <br />Truck Bed (volume,) Basis: <br />
The URL can be used to link to this page
Your browser does not support the video tag.