Laserfiche WebLink
TEST PIT LOG TEST PIT <br /> DIEngineering Analytics,Inc. NO.: <br /> N PROJECT: SCHWARTZWALDER MINE PAGE: 2 OF 2 <br /> PROJECT NO.: 110385 DATE: 8/31/2016 EA-TP5 <br /> WIDTH/DIAMETER(FEET) <br /> 0 5 10 15 <br /> 0 <br /> I <br /> SAMPLE SAMPLE <br /> I I I DEPTH <br /> I.D. TYPE'---- ----T----TI----I ---- ----'r--- --- r - '---- 3' 3' BULK <br /> I I I I I <br /> I I 1 ' 5' S' BULK <br /> I I I I I I I I I I I 1 <br /> I I I I I I I I 1 I <br /> I I I I I I I I 1 I <br /> I 1 1 I <br /> ____ ____1____1____L____L_ 1 L----L_I __J_I ___J____ <br /> I I I I I I I I I <br /> I I I I I I I 1 I I I <br /> i 1 I I I i I I I I I I <br /> I I I I I I I I I I <br /> 5 <br /> I 1 1 I I I I I I I I I <br /> I I I 1 I I I I I I I <br /> I I I I I I I I I I I I <br /> I I I I I I I I I I I I <br /> I I I I I I I I I I I I <br /> W I I I <br /> I I <br /> LL I I I I I I I I I I 1 I <br /> I I I I I I I I I I I I <br /> I I I I 1 I I I I I 1 I <br /> I I I I 1 I I I I 1 1 I <br /> a I 1 I I <br /> W I 1 I I <br /> I I I I I I I I t I I 1 <br /> Q I I I I I I I I I I I I <br /> 1 1 I I I I I I I I I I <br /> I I I I I I I I I I 1 I <br /> I I 1 I I I I I I I I I <br /> 10 <br /> I I I I I I I I I I I I <br /> I I I I I I I I I I I I <br /> I I I I I I I I 1 I I <br /> I <br /> I I --- <br /> I I I I I I I 1 I I I I <br /> I I I I I I I I I I I I <br /> I I I I I I I 1 I I I I <br /> --- ---- I --- <br /> I I I <br /> I I I I I I I I <br /> 1 1 I I I I I 1 <br /> I I I I I I I I I I I I <br /> I I I I 1 I I I 1 I I I <br /> I I I 1 I I I I 1 I I I <br /> I 1 1 i I I <br /> L____L___J____J____ <br /> 1 I I I I I I I I I I I <br /> 1 I I 1 I 1 I I I I I I <br /> I I I I I I I I I I I <br /> I I I I I 1 I I I I I <br /> 15 <br /> SOIL SOIL SOIL DESCRIPTION AND EXCAVATION NOTES <br /> TYPE DEPTH <br /> 0 0- SANDY/COBBLEY GRAVEL <br /> E.O.T.P. MOIST,DARK BROWN(10YR 3/3),SANDY/COBBLEY GRAVEL WITH TRACE BOULDERS,ANGULAR <br /> TO SUBANGULAR ROCK <br /> ESTIMATION OF GRAIN SIZE OF SPOILS PILE: <br /> 30%SAND OR SMALLER <br /> 45%GRAVEL <br /> 20%COBBLES <br /> 5%BOULDERS <br /> -(APPROX.5')(E.O.T.P.) <br /> NOTES: <br />