Laserfiche WebLink
11/8/2016 State co.us Executive Branch Mail-RE:(EXTERNAL)Re:TR-83 Adequacy Review Responses M 1980244 <br /> 1) In response 1, CC&V plans to use the approach in the November 2, 2016 correspondence for the area of unlined haul <br /> road between the LOB and SGVLF. Please confirm this includes quarterly sampling of sediment/standing water in this <br /> portion of the haul road's respective drainage channel and stormwater sumps. <br /> 2) In the attached Meteoric Water Mobility Procedure, 6.1 states that field sampling should be accomplished to insure a <br /> representative mine rock sample is obtained and 6.3 further defines representative with respect to surface area and <br /> particle sizes. Please confirm that a representative sample also includes variations in the depth of material being <br /> sampled. <br /> Please contact me if you have any questions. <br /> Thanks <br /> Elliott R. Russell <br /> Environmental Protection Specialist <br /> V� <br /> P 303.866.3567 x8132 ( F 303.832.8106 1 C 303.903.4456 <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 <br /> Elliott.Russell@state.co.us I http://www.mining.state.co.us <br /> On Tue, Nov 8, 2016 at 7:17 AM, Erik Munroe<Erik.Munroe@newmont com> wrote: <br /> Elliott, <br /> Please find the attached document to address comments from you dated November 7th, 2016. A hard copy will be sent <br /> today via USPS. <br /> Regards, <br /> Erik <br /> NEWMONT <br /> Erik Munroe <br /> Senior Environmental Coordinator <br /> Sustainability&External Relations Department <br /> Cripple Creek&Victor Gold Mine <br /> https•//mail google.com/mail/u/0/?ui=2&ik=96bdlddfe5&view=pt&search=inbox&th=15845fbf7f662647&siml=15845fbf7f662647 2/3 <br />