Laserfiche WebLink
140 <br /> • <br /> 120 <br /> 100 0 MW-2 <br /> • MW-3 <br /> aa) 80 • <br /> • • MW-4 <br /> a) <br /> rn <br /> N <br /> v 60 -�- • MW-6 <br /> C <br /> O <br /> • • MW-7 <br /> U <br /> Q <br /> 40 <br /> a _ <br /> E <br /> <n <br /> 0 20 <br /> U <br /> U <br /> N <br /> O <br /> a` <br /> O <br /> 0 <br /> 19 60 80 100 120 140 160 180 200 <br /> z <br /> Time Elapsed after Well Purge (days) <br /> 8 <br /> CO <br /> 0 <br /> Notes: Figure 4 <br /> cy <br /> MW-1 and MW-5 are not purged dry during sampling events, therefore, recharge is not displayed on graph. Well Recharge <br /> N <br /> o Holcim Boettcher Quarry <br /> a <br /> Technical Revision Request: Permit M-1977-348 <br /> 10/17/2016 1547675 Golder Associates <br />