Laserfiche WebLink
E <br /> I <br /> i <br /> ! 4. If you sell the property associated with this permit,you must obtain the signature of the new owner in the space provided <br /> and forward a copy of the permit to this office to validate the transfer of this authorization. <br /> 5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions <br /> st specified in the certification as special conditions to this permit. For your convenience,a copy of the certification is attached <br /> if it contains such conditions. <br /> 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure <br /> that it is being or has been accomplished in accordance with the terms and conditions of your permit. <br /> Special Conditions: <br /> I <br /> See pages 5 and 6 for a continuation of General Conditions. <br /> After a detailed and careful review of all of the conditions contained in this permit, the permittee <br /> acknowledges that, although said conditions were required by the Corps of Engineers, nonetheless the <br /> permittee agreed to those conditions voluntarily to facilitate issuance of the permit; the permittee will comply <br /> a fully with all the terms of all the permit conditions. <br /> t � <br /> Further Information: <br /> 1. Congressional Authorities:You have been authorized to undertake the activity described above pursuant to: <br /> ( )Section 10 of the Rivers and Harbors Act of 1899(33 U.S.C. 403). <br /> (x)Section 404 of the Clean Water Act(33 U.S.C. 1344). <br /> I <br /> j ( )Section 103 of the Marine Protection,Research and Sanctuaries Act of 1972(33 U.S.C. 1413). <br /> 2. Limits of this authorization. <br /> a. This permit does not obviate the need to obtain other Federal,state, or local authorizations required by law. <br /> b. This permit does not grant any property rights or exclusive privileges. <br /> c. This permit does not authorize any injury to the property or rights of others. <br /> 1 d. This permit does not authorize interference with any existing or proposed Federal project. <br /> 1 <br /> 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the <br /> following: <br /> a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from <br /> natural causes. <br /> b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on <br /> behalf of the United States in the public interest. <br /> c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the <br /> activity authorized by this permit. <br /> d. Design or construction deficiencies associated with the permitted work. <br /> i <br /> e. Damage claims associated with any future modification,suspension, or revocation of this permit. <br /> 2. <br />