Laserfiche WebLink
PERMIT #: M-1982-155 <br />INSPECTOR’S INITIALS: TC1 <br />INSPECTION DATE: May 26, 2016 <br /> <br /> <br />Page 3 of 8 <br />removed this stipulation from the permit. The permit was transferred to Schmidt Construction <br />in (SO-02) in 2001. <br /> Commitments/Stipulations: ST-01 was removed from the permit as described above. <br /> Other Records <br />a) The total permitted area is 742.8 acres (including the 49.8 acres approved in AM-03), the 2015 annual <br />report indicated 351 acres of disturbance. This includes the ~63 acres in the northeast portion of the <br />permit area that appeared to be ready for release. <br />b) The previous inspection was performed on 10/28/2011. No problems were cited. <br />c) The anniversary date is December 31. Annual reports and fees are current through 2015. <br />d) The post-mine land use is rangeland. <br /> <br /> <br /> <br />Figure 1. Google Earth image of northeast reclaimed pit. <br /> <br />Bond: <br />The Division will need to update the bond for the site to address AM-03 if the MLRB approves reconsideration <br />of the 2012 approval of AM-03. <br /> <br />Summary and Recommendations: <br />1. No problems were cited during the inspection. <br />2. The Operator will need to request reconsideration from the MLRB for AM -03 because the financial