Laserfiche WebLink
15. At all times the King II Coal Mine is operated pursuant to this class II land use permit, the permittee shall <br />perform or ensure the following actions regarding traffic limitations are taken; for purposes of this condition, <br />the time a truck leaves the King II Coal mine shall be considered to be the time a final truck ticket is created <br />by the permittee (LPLUC Sec. 82-191 to 193): <br />a. The permittee shall ensure that the monthly average (excluding Sundays), the daily maximum, and <br />the nighttime maximum of trucks hauling coal from the King II Coal Mine do not exceed the <br />following: <br />b. The permittee shall utilize the following formula to calculate the monthly average pursuant to <br />condition 15(a) above: <br />Where: <br />• A = the average number of trucks hauling coal from the King II Coal Mine per <br />day that shall not exceed the limits imposed pursuant to condition 15(a) above. <br />• T = the total number of trucks hauling coal from the King II Coal Mine in a <br />calendar month. <br />• D = the total number of days in a calendar month. <br />• S = the total number of Sundays in a calendar month. <br />c. The permittee shall ensure that no trucks hauling coal leave the King II Coal Mine from Saturday <br />evening at 11:59 pm to Monday morning at 12:01 am. <br />d. The permittee shall ensure that all trucks hauling coal from the King II Coal Mine drive no faster <br />than 25 mph on gravel surfaces and 35 mph on paved surfaces, or 5 mph less than posted speed <br />Project No. 2012-0089 BOCC <br />4837-9189-1506, v. 3 <br />Page 4 of 8 <br />Monday <br />Average. # <br />Monday <br />Night — <br />Saturday <br />Outgoing <br />Maximum # <br />Morning <br />Friday <br />Night <br />Trucks/Day <br />Outgoing <br />Maximum # <br />Morning <br />Maximum # <br />Applicable Time Period <br />/month <br />Trucks/ <br />of Outgoing <br />Maximum # <br />of Outgoing <br />(Sundays <br />Single Day <br />Trucks <br />of Outgoing <br />Trucks <br />excluded) <br />(12:01 am to <br />Trucks <br />(10:00 pm to <br />6:00 am) <br />(10:00 pm — <br />11:59 pm) <br />Project approval up to and <br />including date of <br />80 <br />96 <br />14 <br />19 <br />5 <br />Preliminary Acceptance <br />of Phase 1, 2 and Phase 3 <br />Commencement of Phase <br />4 up to and including date <br />100 <br />120 <br />18 <br />24 <br />6 <br />of Preliminary <br />Acceptance of Phase 5 <br />Subsequent to <br />Preliminary Acceptance <br />120 <br />144 <br />22 <br />29 <br />7 <br />of Phase 5 <br />b. The permittee shall utilize the following formula to calculate the monthly average pursuant to <br />condition 15(a) above: <br />Where: <br />• A = the average number of trucks hauling coal from the King II Coal Mine per <br />day that shall not exceed the limits imposed pursuant to condition 15(a) above. <br />• T = the total number of trucks hauling coal from the King II Coal Mine in a <br />calendar month. <br />• D = the total number of days in a calendar month. <br />• S = the total number of Sundays in a calendar month. <br />c. The permittee shall ensure that no trucks hauling coal leave the King II Coal Mine from Saturday <br />evening at 11:59 pm to Monday morning at 12:01 am. <br />d. The permittee shall ensure that all trucks hauling coal from the King II Coal Mine drive no faster <br />than 25 mph on gravel surfaces and 35 mph on paved surfaces, or 5 mph less than posted speed <br />Project No. 2012-0089 BOCC <br />4837-9189-1506, v. 3 <br />Page 4 of 8 <br />