My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-09-19_REVISION - M2004061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004061
>
2016-09-19_REVISION - M2004061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:12:41 PM
Creation date
11/4/2016 10:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004061
IBM Index Class Name
REVISION
Doc Date
9/19/2016
Doc Name
Application
From
Linke Construction, Inc. / Everist Materials, LLC
To
DRMS
Type & Sequence
SO1
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL STABILITY EXHIBIT <br /> This information is presented to address the plan to mine <br /> within 200 feet of the structures listed in Exhibit S. This <br /> analysis is presented in leu of obtaining agreements from the <br /> numerous owners of the noted structures. Linke Construction <br /> Inc. , in this application, has committed to mining slopes adja- <br /> cent to structures at their final slope rate. Under the approved <br /> plan this would be 1:1 from the existing ground surface to the <br /> mine floor. This leaves a stable slope of undisturbed solid rock <br /> adjacent to the fence. Along the east side the fence varies from <br /> 50 to 93 feet east of the digline and will not be affected by <br /> mining. <br /> Along the south side the floor of the mine will be above the <br /> noted structures. To avoid any problems, Linke will have any <br /> buried communication lines located to assure they will not be <br /> disturbed. <br /> The following report was prepared by Revey & Associates to <br /> address the geotechnical issues with the proposed mined. It <br /> includes a blasting plan that will be followed by the operator <br /> and discussion of the nature of the material to be mined. <br /> 50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.