My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-02_PERMIT FILE - M2016076
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016076
>
2016-11-02_PERMIT FILE - M2016076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 9:28:13 AM
Creation date
11/4/2016 10:03:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016076
IBM Index Class Name
PERMIT FILE
Doc Date
11/2/2016
Doc Name
Application
From
Bestway Concrete Company
To
DRMS
Email Name
ERR
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L- RECLAMATION COSTS <br /> The information provided in this Exhibit is intended to satisfy the requirements outlined in Section <br /> 6.4.12 of the Colorado Mined Land Reclamation Board Construction Material Rules and <br /> Regulations: <br /> All Phases have approximately the same area that will be disturbed at one time, therefore this area <br /> is used to calculate the potential reclamation liability. <br /> ■ Phase 1 would be 100% mined and 100% reclaimed. Mining will be complete for this <br /> phase with mining occurring at the final shoreline reclamation slope (311:1V). This phase <br /> will require final grading, topsoil placement, seed and mulch. <br /> ■ Phase 2 would be 100% mined and 100% reclaimed. This phase will be mined at the final <br /> shoreline reclamation slope (311:1V). This phase will require final grading, topsoil <br /> placement, seed and mulch. <br /> ■ Phase 3 would be 100% mined and 100% reclaimed. This phase will be mined at the final <br /> shoreline reclamation slope (3H:1 V). This phase will require final grading, topsoil <br /> placement, seed and mulch. <br /> ■ Phase 4 would be 100% mined and 100% reclaimed. This phase will be mined at the final <br /> shoreline reclamation slope(3H:1V). This phase will require final grading, topsoil <br /> placement, seed and mulch. <br /> ■ The slurry wall is proposed to be installed prior to exposure of groundwater. Therefore we <br /> request the option for 20% bonding of this cost. The slurry wall design, specifications, and <br /> quality assurance plan will be approved through a technical revision process prior to <br /> exposure of groundwater in the pit. <br /> Please refer to the attached table for estimates of quantities and associated costs. <br /> Bestway Concrete&Aggregates—Lupton Meadwos Gravel Mine—MLRB 112 Permit Application <br /> Exhibit L-1 <br />