Laserfiche WebLink
October 26, 2016 <br />Tim Cazier <br />CO DRMS <br />1313 Sherman Street Room 215 <br />Denver, CO 80206 <br />Stephanie Carter <br />US BLM <br />Royal Gorge Field Office <br />3028 East Main Street <br />Canon City, CO 81212 <br />RE: P-2013-002 Dawson Gold Project <br />Zephyr Gold USA Ltd (Zehpyr) <br />// Post exploration site inspection follow up report <br />Dear Ms. Carter and Mr. Cazier, <br />RECEIVED <br />L"NOV 0 1 2016 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Zephyr continued exploration during this past summer, June through August 2016. <br />Sixteen exploration holes were drilled from five locations within the mountain road <br />disturbance on Windy Gulch (Figure 1). <br />Soil staining was observed on September 29, 2016, during a post exploration site <br />visit by your agency. Upon learning of the stained soil, Zephyr contacted the drilling <br />company, Godbe Drilling Co. (Godbe), and requested immediate remediation of the sites. A <br />Godbe representative remediated the sites October 13 thru October 18. Photos of the <br />remediated sites follow as Figures 2 thru 6. <br />Please feel free to contact me with any questions. <br />Respectfully submitted, <br />I <br />Angela Bellantoni Ph.D. <br />Cn�01rronrnnerqlLal) /�k LLcorrfglathWecS Ilnc„ <br />1107 Main Street, Canon City, CO 81212 <br />www.envalternatives.com • e-mail: eai@bresnan.net <br />Phone: 719-275-8951 • Fax: 719-275-1715 <br />