My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-31_PERMIT FILE - M2010034
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010034
>
2016-10-31_PERMIT FILE - M2010034
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2021 12:07:19 PM
Creation date
11/2/2016 8:47:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010034
IBM Index Class Name
PERMIT FILE
Doc Date
10/31/2016
Doc Name
Adequacy Review - Preliminary
From
SYZYGY Enterprises, LLC
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) All water diversions and impoundments; <br /> It is not anicipated that this operation will impact surface or groundwater.A <br /> water truck will be assigned to the site when in operation for dust control if <br /> needed. If dust control water is needed it will be obtained from sources owned <br /> by the property owner made available to us form this purpose. <br /> Stormwater will be controlled on site and released in a controlled manner to <br /> not damage off site areas in accordance with the operation's stormwater <br /> management plan. <br /> (d ) The size of area(s)to be worked at any one time. <br /> The entire 30.12 acre mining site will be mined in one phase.Also the 1.82 acre <br /> site for the scale and scale house will be active during the entire time. <br /> (e ) An approximate timetable to describe the mining operation.The time table is <br /> for the purpose of establishing the relationship between mining and <br /> reclamation. <br /> It is estimated that mining will be completed within ten years, but the life of <br /> the operation is dependant on market demand.While sloping of the banks and <br /> other reclamation activities may take place during mining it may take an <br /> additional twelve months to reclaim the site. <br /> (f) Use Mining Plan Map in conjunction with narrative to present; <br /> (i. ) Nature, depth and thickness of the deposit and thickness and type <br /> of overburden to be removed. <br /> The topsoil ranges in depth from 0"to 6" inches over the site,there <br /> is no overburden and the sand and gravel depth at it's highest is <br /> 50' in depth. <br /> ( i. i. ) Nature of the stratum immediately beneath the material to be mined <br /> in sedimentary deposits. <br /> The stratum immediately beneath the sand and gravel deposit is <br /> claystone with lenses of siltstone and sandstone bedrock. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.