Laserfiche WebLink
(c) All water diversions and impoundments; <br /> It is not anicipated that this operation will impact surface or groundwater.A <br /> water truck will be assigned to the site when in operation for dust control if <br /> needed. If dust control water is needed it will be obtained from sources owned <br /> by the property owner made available to us form this purpose. <br /> Stormwater will be controlled on site and released in a controlled manner to <br /> not damage off site areas in accordance with the operation's stormwater <br /> management plan. <br /> (d ) The size of area(s)to be worked at any one time. <br /> The entire 30.12 acre mining site will be mined in one phase.Also the 1.82 acre <br /> site for the scale and scale house will be active during the entire time. <br /> (e ) An approximate timetable to describe the mining operation.The time table is <br /> for the purpose of establishing the relationship between mining and <br /> reclamation. <br /> It is estimated that mining will be completed within ten years, but the life of <br /> the operation is dependant on market demand.While sloping of the banks and <br /> other reclamation activities may take place during mining it may take an <br /> additional twelve months to reclaim the site. <br /> (f) Use Mining Plan Map in conjunction with narrative to present; <br /> (i. ) Nature, depth and thickness of the deposit and thickness and type <br /> of overburden to be removed. <br /> The topsoil ranges in depth from 0"to 6" inches over the site,there <br /> is no overburden and the sand and gravel depth at it's highest is <br /> 50' in depth. <br /> ( i. i. ) Nature of the stratum immediately beneath the material to be mined <br /> in sedimentary deposits. <br /> The stratum immediately beneath the sand and gravel deposit is <br /> claystone with lenses of siltstone and sandstone bedrock. <br /> Page 4 <br />