Laserfiche WebLink
i <br /> months of March thru October each year and during the skipped months if deemed <br /> necessary.The weeds being addressed but not limited too are any thisle species of which <br /> there are many, diffuse knapweed,absinth wormwood,tansy ragwort and giant <br /> knotweed.We will take the appropriate action whether it be spraying, mowing or grading <br /> at the time of growth.Approved sprays only will be used and will be handled in the correct <br /> and proper manners,with the help and guidance of professional weed control companies <br /> and personnel. <br /> 9 Exhibit F is attached. <br /> 10 Exibit D paragraph (f)section ( L)has been changed to reflect the correct depth.A new copy <br /> of the page is attached. <br /> 11 Topsoil will be stockpiled in the two locations designated on exhibit C,the site will be worked in <br /> one phase,the reclamation will be done when mining is complete.There will be no backfilling <br /> required as all slopes will be sloped as mining occurs and will be construted from in place material. <br /> Topsoil will be placed by use of a scraper and leveled as the placing occurs,topsoil will be keyed <br /> to the underlying material by the use of a harrow.Seeding will then be done by mechanical <br /> drilling in such a manner so as to establish an effective and long lasting cover that is capable of <br /> self regeneration without dependance on irrigation or fertilizer. <br /> 12 Copies of the certified mailing to the Board of County Commissioners and Soil Conservation <br /> District are attached.They were sent with no return receipt which was a mistake on our part, <br /> please let us know what we will need to do for the corrective action. <br /> 13 A receipt showing the date the revised application was placed with the Weld County Clerk <br /> is attached. <br /> Please let us know if there are any further questions, <br /> Sincerely, <br /> RckMile <br /> q4P�' <br /> SYZYGY Enterprises, LLC <br /> Page 2 <br />