Laserfiche WebLink
,�;Xj <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> '8'6 RECEIVE® <br /> REQUEST FOR TECHNICAL REVISION (TR') COVER SHEET 1-16V 0 12016 <br /> (File No.: M- O300 Site Name: V /Y < n- r0 ✓C �`-#VISION OF RECLAMATION <br /> // Mll!lI M AND SAFETY <br /> County 9u C_ yTR#_y (DRMS Use only) <br /> V-11p,ermittee: Jame S Coo La!::( — J arc( X L rwnc s- /on OrOCb_�_e_7�s <br /> Operator(If Other than Permittee): 1 <br /> Permittee Representative: Q�(�')eS CO D <br /> Please provide a brief description of the proposed revision: WhCA 1 ot,Uz;WQ -Pd 4 S pi�'�l'Q M <br /> film aMk(Ut .. W,`115cGlout n 6HOhey 6-P21015We !Q!!e6r-kd finer-�-F,'l <br /> jas Gt l reak The As ha 14-ms ro-&lm 'lleo(6md ZWeu,Pd tt'A�e - <br /> 16 serlf- <br /> f�5 r6 adc" s, Please s�� �-FtacGie l e r � T�rt.J,`rl srtiae� �e 5c;j <br /> �As defined by the Mineralules, a Technical Revision (TR) is: "a change in the permit or application which does not have more than a minor effect upon the approved or proposed Reclamation or 6nerd " <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division (as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee,the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies,the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type -Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction <br /> materials, and 112 quarries $216 l� <br /> 112 hard rock(not DMO) $175 <br /> 110d, 112d(1, 2 or 3) $1006 0 <br /> Annual Fee and Report - CW <br /> ,/ No Violations <br />