Laserfiche WebLink
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX: (970) 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />October 25, 2016 <br />Jason Musick '�• <br />Division of Reclamation, Mining & Safety rVP <br />1313 Sherman St., Room 215�k;(,V <br />Denver, CO 80203 0 1 ?416 <br />,f Rove <br />1.�1,,,�� �fe ation <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine y <br />MR -191, Relocation of Temporary Culvert'T-F1" <br />Permit C-1996-083 <br />Dear Mr. Musick: <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />On behalf of Bowie Resources, LLC (BRL), enclosed is a minor revision application to revise the <br />location of Temporary Culvert T -F1. Temporary culvert was approved to be installed in the East <br />Diversion ditch at the north end of gob pile #2, however the culvert was never installed. This <br />revision will revise the location on page App. B-102, and the design on page App. B-103. <br />Currently, Temporary Culvert T -F1 has a bond in place for $273.60 with an associated length of <br />60 feet. The planned installation with this revision will not exceed 60 feet and therefore a new <br />bond amount is not necessary. The new location of Culvert T -F1 will be from the top of gob pile <br />#2 to ditch F8. <br />Enclosed are pages App. B-2, 102 and B-103. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />01-k- '01-c� <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />